24ton Excavator Mounted Sheet Pile Driver 6m/Min Construction Works

Place of Origin GUANGZHOU
Brand Name FANGBANG
Minimum Order Quantity Negotiable
Price Negotiable
Product Details
Applicable Industries Building Material Shops, Construction Works Piling Speed(m/min) 6m/ Min
UNIQUE SELLING POINT High Digging Power Composition Assistant Hand,main Body, Clip Mouth
Suitable Excavator 20-24ton Type Hydraulic Sheet Pile Driver
High Light

FANGBANG excavator mounted sheet pile driver

,

excavator mounted sheet pile driver 6m Min

,

6m Min hydraulic pile driver

Leave a Message
Product Description

Construction Works Excavators Vibratory Pile Driver Hydraulic Pile Driver

 

Features

* Adopts highly efficient imported damping rubber block, stable quality, laongservice life.
* Adopts original imported hydiraulic motor, high efficiency of vibrating power.
* Powarful hydraulic cylinder, super duralblle tooth pieca.
* Strong and tight clip mouth ensures safety.
* Liltle noise and short construction period, overcome errvironimental problems.Designed for excellent strength, good durability and performance.
* Applied to plle or extract steell sheet piles,steel pipe piles,cement pile, Especially suitable for municipal,bridges, coflferdam, building foundation ets.
 
◆Using Q345 manganese plate steel, high strength, and corrosion resistance;
◆The pin shaft is made of 42CrMo alloy steel with built-in oil passage, which has high strength and good toughness;
◆The rotating motor adopts Swiss imported motor;
◆The vibration motor adopts a German Bosch Rexroth hydraulic motor, which is strong and durable;
◆The oil seal adopts the imported oil seal from the United States to extend the service life;
◆The shock absorber adopts Korean Autox, which is self-willed and wear-resistant;
◆One-piece design, safe and stable, low failure rate.

 

Details
 

hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects. Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc. With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles, etc.

1. Applied to driving and pulling steel plate, cement pile, steel rail, round pipe, steel H-pile, Lasson pile.

2. fast conversion between driving and pulling work.

3. less tension when pulling piles.

4. no damage to the bottom or top of steel plate and steel rail pile.

5. No damage to the buildings even working frequently nearby.

6. Silent work and short construction period, overcome environmental problems.

 

Specification
 
Item/Model
Unit
JSP180
JSP250
JSP280
JSP350
JSP450
Sunitable Excavator
ton
12-17
18-25
25-30
30-40
40-50
Eccentric Moment
Nm
32
36
40
45
65
Frequency
rpm
2500
2800
2800
2800
2800
Centrifugal Force
kN
172
265
330
420
570
Working Pressure
bar
300
300
320
320
320
Oil Flow
L/min
120
155
155
168
255
Max Turning
Degree
180
180
180/360
180/360
180/360
Weight
Main Body
kg
1100
1700
1900
2800
2960
Extension Boom
kg
260
500
500
700
740
Total Weight
kg
1360
2200
2400
3500
3700

 

 

How does a hydraulic excavator pile hammer work?
1. The vibrating pile hammer uses its high-frequency vibration to vibrate the pile body with high acceleration to generate the pile by mechanical vertical vibration, which causes the oil structure around the pile column to change, thereby changing the direction around the pile. Reduces frictional resistance between pile and soil. 2. Then use the excavator to push down, vibrate the pile hammer and the weight of the pile body sink into the pile When digging a pile, use an excavator hoist to pull the pile out under vibration force. 3. The excitation force required by pile machinery is determined by the soil on the site Conditions, moisture content, and type of pile, construction.
 
FAQ
Q1. What is your best price?
A:We are direct factory will offer you best competition price.

Q2. How can I contact you? Am I should trust you?
A:You can choose Trade assurance as your payment way which can protect your benefits, we are Alibaba golden member three-star
shop.

Q3. What is payment term?
A:Western union, T/T, trade assurance are acceptable.


Q4: When would be your delivery date?
A:Usually 25-30 days after get your payment, and we will try our best to fill in your requirements. We focus on the management
belief of "Quality first, Reputation significant, Customer based".